Human resources
Control attribute
Attribute | Attribute type group | Type | Default value |
|---|---|---|---|
Number of employees | Simulation | Integer (1 to + infinite) | 1 |
Priority | Simulation | Integer (0 to + infinite) | None |
Cost rate (busy time) | Simulation | Floating point number (0.0 to + infinite)/Currency | None |
Cost rate (idle time) | Simulation | Floating point number (0.0 to + infinite)/Currency | None |
Result attribute
Attribute | Attribute type group | Type | Default value | |
|---|---|---|---|---|
Processed functions | Simulation > Results | Integer (0 to + infinite) | None | |
Orientation time sum | Simulation > Results | Time | None | |
Processing time sum | Simulation > Results | Time | None | |
Degree of utilization | Simulation > Results | Floating point number (- infinite to + infinite) | None | |
Accumulated scheduled time | Simulation > Results | Time | None | |
Accumulated idle time | Simulation > Results | Time | None | |
Accumulated overtime | Simulation > Results | Time | None | |
Interruptions during orientation | Simulation > Results | Integer (0 to + infinite)/Currency | None | |
Interruptions during processing | Simulation > Results | Integer (0 to + infinite)/Currency | None | |