Skip to main content

Get help for ARIS Architect

Status' tab

Displays current information on the simulation run during the simulation based on your simulation settings.

  • Current time: Current simulation point in time.

  • Simulation state: Current simulation run state.

  • Progress: Graphical display of the simulation time that has elapsed in proportion to the total duration of the simulation. If a warm-up phase is defined, the end is indicated by a black horizontal bar.

  • Start: Simulation start time.

  • End: Simulation end time.

  • Warm-up phase: If a simulation time period is specified, the end time for the warm-up phase is specified with time (hours, minutes, seconds) and date (day, month, year). If a duration is specified, the warm-up duration is specified in days, hours, minutes, seconds.